NWT will take over the design works and process engineering for a drinking water treatment plant in Ghana.
The internationally financed project provides for the extraction of river water which is severely impacted by activities of upstream gold mines and shows strong seasonal quality fluctuations.
With 2,400 m3 / d, the system is not very large – however, the raw water parameters require a treatment process that consists of several physical, chemical and biological stages.
Especially since the local conditions call for robust system technology rather than “high-tech”, the customer demands processing stages that have already been introduced in the region and that are as conventional as possible.
A project implementation is expected in 2023.