NWT is developing a concept for wastewater collection and treatment from small industrial clusters for Cibu production, batik textile processing and tofu production, consisting of around 100 small family businesses as well as decentralized domestic sludge from septic tanks.
Sludge to Energy Concept Design and Tender for 2 large Wastewater Treatment Plants in Egypt
NWT is developing a concept and the tender documents for the recovery and energy usage of the sewage sludge produced by 2 large sewage treatment plants in Egypt, each with around 1 million PE. After previous evaluation of several options ...
Residual Sludge Management from Water Treatment Plants in Egypt
NWT is conducting a nationwide study on the quality, quantity and reuse possibilities of sludge from water treatment plants with a daily capacity of 25 million m3/d. The turbidity, which comes mainly from the Nil river, produces sludge with a high aluminium content.
NWT celebrates its 10th anniversary
NWT received a certificate of honor from the Salzburg Chamber of Commerce as part of the WKS event "Salzburg Success Stories" at the Kavalierhaus Klessheim. NWT received these awards for 10 years of successful entrepreneurial achievements.
New Wastewater Treatment plant in Georgia
As part of the refurbishment and new construction measures for roads, drinking water supply, wastewater collection and wastewater treatment in the tourist town of Kazbegi / Georgia near the border to Russia, NWT is responsible for the concept planning and preparation of..
NWT has its own test laboratory for hydraulic simulations
Since middle 2021 NWT has established a hydraulic test-site for lab scale hydraulic modelling. It is specifically applied for analysing of flow distribution patterns and short cutting potential in settling tanks, biological tanks and SBR facilities as well as...
WWTP New Administrative Capital (NAC) in Egypt
The ambitious project for the new administrative capital in Egypt is in full swing. The completely new city for approx. 10 million inhabitants is located 80 km from the Nile River, but will still be supplied with water from there. In addition to the administrative district, an airport, a 14-lane motorway and complete infrastructure, the ...
ENYSTO heat storage
NWT hat einen Wärmespeichertank ENYSTO entwickelt, welcher mit 2.000 l bis zu 160 kWh speichern kann. Im Vergleich zu einer Batterie ist das ein Vielfaches an Speichervermögen. In Kombination mit Photovoltarik ist es die ideale Lösung Wärmeenergie selber zu...