NWT prepared a feasibility study for the Vienna waterworks MA 31 for the rehabilitation of an existing groundwater treatment plant from the early 1970s. The treatment plant consists of 2 horizontal groundwater wells with 80 l / s each and an iron and manganese reduction plant with predominantly manual operation. The study proposes 2 solutions with technical options and price comparisons.