Consulting Service for the 2nd Vienna Hochquellleitung

2018: Plant engineering consulting and hydraulic optimisation for the integration of a UV and a ClO2 disinfection system with a capacity of 2.8 m3/s into the supply scheme of the 2nd Vienna High Source Pipeline. The disinfection system will be installed between the existing transition chamber built in 1910 and the 140,000m3 Lainz water reservoir built in 1936.