von , Austria, NWT | Jul 15, 2022 | reference
NWT provided the consulting services for studies for 8 medium-sized cities in Serbia within a KfW-funded project for the rehabilitation and construction of sewerage systems and wastewater treatment plants.
The project includes the...
von , Austria, NWT | Feb 17, 2022 | reference
NWT prepared a feasibility study for the Vienna waterworks MA 31 for the rehabilitation of an existing groundwater treatment plant from the early 1970s. The treatment plant consists of 2 horizontal groundwater wells with 80 l / s each and an iron ...
von , Austria, NWT | Jun 11, 2021 | news
NWT will take over the design works and process engineering for a drinking water treatment plant in Ghana. The internationally financed project provides for the extraction of river water which is severely impacted by activities of upstream gold mines and shows strong seasonal quality fluctuations. With 2,400 m3 / d, the system is not very...
von , Austria, NWT | Jun 10, 2021 | news
As part of the ISWM II program financed by the German KfW, NWT is providing the designs for 2 domestic solid waste landfills. The leachate treatment plants will be integrated into the landfills which are currently under design/construction and shall treat highly contaminated leachates of up to 120 m3/d. A specific challenge is the very
von , Austria, NWT | Feb 26, 2021 | reference
2019: The viscose fibre manufacturer Lenzing (Nanjing) Fibers Co Ltd is planning to build a new industrial wastewater treatment plant (26,000 m³/d , 320,000 pe) on the company site. NWT delivered a concept study, the preliminary design and the tender documents with the...