von , Austria, NWT | Oct 13, 2020 | reference
2020: The German GIZ managed a revitalisation and capacity building project for 11 wastewater treatment plants in the region of Irbid/Jordan over a period of 19 months. NWT was involved in this project as International Process Specialist and was integrated into the team ..
von , Austria, NWT | Feb 22, 2020 | reference
2018: Plant engineering consulting and hydraulic optimisation for the integration of a UV and a ClO2 disinfection system with a capacity of 2.8 m3/s into the supply scheme of the 2nd Vienna High Source Pipeline...
von , Austria, NWT | Feb 21, 2020 | reference
2016: Optimization measures were carried out at the Schützen am Gebirge wastewater treatment plant together with the partner VERBUND, which significantly improve both the energy efficiency and the operation of the plant.
von , Austria, NWT | Feb 21, 2020 | reference
2017: NWT has optimized the aeration and air supply scheme at the industrial production site of one of the largest pulp and synthetic fibre producers in Europe. The overall plant has a design load of 60 tCOD/d and comprises a 2 stage anaerobic treatment ....
von , Austria, NWT | Feb 20, 2020 | reference
2016/2017; Trennung von Kühlkreisläufen in der Lebensmittelindustrie mit Konzepten der Wärmerückgewinnung für 7 Produktionslinien und einer installierten Leistung von 14 MW; Tätigkeiten NWT: Design und Simulation, Kosten/Nutzen Analyse, 3 D Planung,...